Infrastructure and services:
- The project will have 2 lanes in each direction, a bike lane and a pedestrian sidewalk, with a platform width of 28.44 m.
- Standby generators for 100% of the load of each lot and common areas with automatic transfer.
- Effluent Treatment Plant.
- Water Purification Plant.
- 24-hour security and monitoring.
Location:
The section is located in the area between Asunción and Chaco’í (district of Villa Hayes) and includes both the crossing of the Paraguay River and the connection to the existing road network in the Capital and the route to Puerto Falcón.
Terms: